Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the members domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/msghana5/public_html/wp-includes/functions.php on line 6131
Pinnacle – M&Sousa Ghana

Pinnacle

It is a mixed development of 4-bedroom (plus 1 bedroom staff quarters), detached and semi-detached houses.

  • Location Airport Residential Area

  • Year 2019

  • Project Status Completed

  • Type Residential


Media Gallery
Start a Project

Are you planning a construction project?

Get in touch with us
Contact Image