Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the members domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/msghana5/public_html/wp-includes/functions.php on line 6131
Vihama Energy – M&Sousa Ghana

Vihama Energy

Vihama Energy Company Limited is a privately owned Ghanaian Company mandated by the National Petroleum Authority (NPA) to operate as a Bulk Distribution Company (BDC) in Ghana.

  • Location Labone

  • Year On-going

  • Project Status On-Going

  • Type Commercial


Media Gallery
Start a Project

Are you planning a construction project?

Get in touch with us
Contact Image